
BUILDINGTECHNOLOGY1
*KINDLY CLICK THE TITLE 'PROJECT 1 - INDUSTRIALIZED BUILDING SYSTEM' FOR THE PROJECT' 1'S BRIEF
PROJECT 1 AIMS TO INSTILL EXPOSURE ON THE TOPIC OF INDUSTRIALIZED BUILDING SYSTEM (IBS). OUR FIRST TASK WAS TO DESIGN A 3-TOREY APARTMENT BLOCK USING MAINLY IBS COMPONENTS. THE IBS SCORE WAS THEN CALCULATED. THE SECOND PHASE OF THE PROJECT WAS TO CONSTRUCT A PHYSICAL SECTIONAL MODEL OF SCALE OF THE BUILDING TO SHOW THE IBS COMPONENTS IN DETAIL. AN A3 SIZED REPORT WAS THEN COMPILED COMPRISING THE STUDY OF PROPOSED IBS CATEGORIES AND COMPONENTS, RELEVANT DRAWINGS, CONSTRUCTION SEQUENCE AS WELL AS IBS SCORE CALCULATIONS FOR THE BUILDING.






























*KINDLY CLICK THE TITLE 'PROJECT 2 - CONSTRUCTION SOLUTIONS' FOR THE PROJECT' 2'S BRIEF
THE SECOND PROJECT IS AN INDIVIDUAL PROJECT THAT WAS DESIGNED TO BE IN PARALLEL WITH STUDIO V. IT AIMS TO ENGAGE IN THE TECHNICAL STUDIES AND DEVELOPMENT OF THE DESIGN. THE PROJECT HARBORS 2 PARTS. THE FIRST TASK WAS TO CONDUCT PRECEDENT STUDIES OF RECENT, UNIQUE OR COMPLEX CONSTRUCTION SYSTEMS THAT COULD BE APPLIED IN THE DESIGN FOR STUDIO V COVERING A ROOF SYSTEM, 2 FACADE SYSTEMS AND A STRUCTURAL SYSTEM THAT INCLUDES THE FLOOR SYSTEM. THE 2 FACADE SYSTEMS THAT WERE SELECTED AS PRECEDENCE WERE THEN SIMULATED ONTO PROPOSALS FOR THE FACADE OF THE STUDIO V PROJECT. ELEVATIONS, BOTH FRONT AND REAR WERE DEVELOPED. A THOROUGH STUDY WAS CONDUCTED AND COMPILED INTO AN A3 SIZED REPORT.
THE SECOND TASK OF THE PROJECT WAS A REQUIRED AS A SUPPLEMENTARY COMPONENT TO THE REPORT. A DETAILED SECTIONAL PERSPECTIVE OF 2 INTERESTING SPACES WERE PRODUCED COVERING INTERESTING SPACES ON THE GROUND AND TOP FLOOR.